Description

Application:
1. Prepare water for mixing with the concrete.
2. Add water gradually while stirring. Add 250ml of water per 1kg of cement. You can add white glue to speed up drying.
3. The drying time of the finished product is about 1 hour and 30 minutes.

使用方法:
1. 只需要準備水與水泥混合。
2. 攪拌時逐漸加水,每1Kg水泥加入250毫升水,亦可加入白膠浆加快乾固。
3. 成品的乾燥時間约為1小時30分。